Heavy load construction hoist
The inner space of the cage is spacious and the load is large. The maximum cage door height is up to 2.7 meters. It adopts 650×900×1508 mast section to ensure that the guideway meets the force requirements . 4.Inverter control system, smooth running, high efficiency and energy saving. High performance electrical components with famous brand
Technical Data: SC300/300GS Unit
Pay-load capacity: 3000kg
Speed: 0-63m/min
Max. lifting height: 450m
1.The inner space of the cage is spacious and the load is large.
2.The maximum cage door height is up to 2.7 meters.
3.It adopts 650×900×1508 mast section to ensure that the guideway meets the force requirements .
4.Inverter control system, smooth running, high efficiency and energy saving.
5.High performance electrical components with famous brands.
| Technical Data | Unit | SC300/300GS |
| Pay-load capacity | kg | 3000 |
| Speed | m/min | 0-63 |
| Max. lifting height | m | 450 |
| Power supply | V/Hz | 380/50 |
| Motor power | kW | 2x3x18.5* |
| Inverter power | kW | 2×110 |
| Cage size | mm | 4200x2100x3200 |





